![]() ![]() |
![]()
| PetroChemical Successes Event Prediction in Oil and Gas Pipelines |
|
Mission: Prevent flooding of gas systems with oil from a two-phase flow pipeline. Challenge: Solution:
|
Objective A large oil company operates a pipeline from off-shore oil rigs to an on-shore oil and gas processing facility. From time to time, significantly large slugs of oil would overflow slug catchers, flooding gas handling systems. This would lead to shutdowns to clean and recover. The objective is to predict the arrival of these oil slugs so that operators can prepare and prevent shutdowns. The Methods Results |
![]() |
Legal
Policy | Privacy
Policy | Contact Us
Copyright © 1995-2007 BioComp Systems, Inc.. All rights reserved.
IntelliDynamics is a registered trademark of BioComp Systems, Inc.
Last modified:
Thursday July 19, 2007.
Serving the web since Feb 2, 1996